Les MacFarlane and Blair Hinojosa, describe a septic system renovation for the US Bureau of Reclamation. The project consists of indentifying a large number of existing utilities, buildings, and paving. The objective was to replace a septic tank that was not functioning well with a new concrete septic tank and install a dosing pump to be pumped to a new leach field.