Vicinity Software 4.35 Start Date Offset - Formula Manufacturing Software

Vicinity Software 4.35 Start Date Offset - Formula Manufacturing Software

Vicinity Software

55 лет назад

128 Просмотров

With this video, we've combined two features that made sense to review together.

Specify Ingredient Start Date:
1. Click Product Development then Formula Entry.
2. Look up a formula.
3. Select the procedure line on which to attach the parameter.
4. Add the parameter to a formula ingredient, operation, or unit procedure.

Note: start date offsets can be assigned at the ingredient, operation, or procedure level. If assigned to an operation or procedure, MRP will associate the offset with all contained ingredients. If multiple offsets are found, the greatest offset will be applied.

Ingredient Specific Requirement Date:
The requirement date for one or more batch ingredients can now be specified as an offset based on the batch start date. Prior to this enhancement, all ingredients were assumed to be required on the start date. In some industries, breweries as an example, batches may run for multiple days and all ingredients may be required at different intervals.

Parameters assigned to formula ingredients, operations, or unit procedures are used to specify the number of days to add to a batch or planned order start date when determining an ingredient requirement date.