Комментарии:
Tuesday is my 3rd day
ОтветитьReading about the tragedy at schlitterbahn in 2013 where the company was at fault because they didn’t follow this step after the employee passed. Smh
ОтветитьVery informative.
ОтветитьIm interpreting a training camp this week and this seriously helped me so much. Idk if im 100% prepared but I sure as hell feel more prepared now than a few days ago. (They didn't provide me with any material to prepare myself)
Ответитьexcellent training for anyone working with heavy machinery!
ОтветитьThank you Amy walters
ОтветитьOne lock one key
Ответитьto be honest, the best info video I have seen in my 13-year-old journey of being a mechanical engineer. Thank you!
ОтветитьI'm watching this video so I can fall asleep
ОтветитьGot an interview tomorrow and I'm brushing up on things. Thank you.
ОтветитьThomas Stone, well stated advice!
ОтветитьThank you so much for your reporting !
ОтветитьAFTER THE STOP OF MOVEMENT THE LOCKOUT TAG AND LOCK IS APPLIED?
ОтветитьNEUMATIC DRAIN THE AIR?
ОтветитьHYDRAULIC REQUIRES DOWNSTEAM SWITCHES AND BLIND SPOTS IN THE LINE TO DRAIN DOWNSTREAM?
ОтветитьCAPACITORS HAVE TO BE GROUNDED IN ELECTRICAL?
ОтветитьONCE ELECTRICAL EQUIPMENT IS OFF IT WILL NOT MOVE?
ОтветитьELECTRICAL: SWICTHED ON S CAN CAUSE EXPLOSIONS THROUGH ARCS STAND TO THE RIGHT SIDE OF A SWITCH AND THROW IT?
ОтветитьWHEN FINISHED THE LOCKOUT EQUIPMENT SHOULD BE RETURNED TO THE LOCKOUT EQUIP!ENT AREA?
ОтветитьIN A RESTART THE LOCKOUT PROCEDURE SHOULD BE DONE AGAIN?
ОтветитьWHEN CONTRACTORS ARE WORKING ON MACHINES THEY SHOULD CHECK WITH SUPERVISORS?
ОтветитьGROUPS WORKING ON MACHINES CAN ASSIGN ONE EF MPLOYEE PER GROUP?
ОтветитьTHERE MAY BE ENERGY IN ELECTRICAL LOCKOUT LIKE ARC FLASHES LIKE AN ELECTRICAL.EXPLOSION FROM CONNECTION WITH OTHER PARTS OF GROUND?
ОтветитьTHE TAG SHOULD REMOVED BY THE SAME EMPLOYEE THAT TAGGED THE MACHINE?
ОтветитьAFTER A LOCKOUT THERE MAY BE ENERGY? 1. HYDRAULIC: MOVE TAKES OR DRAINS, 2. ELECTRIC: GROUND, MOTORIZED: SPRINGS? THE MACHINE MUST BE ACTIVATED IN THE NON-ENERGIZED EQUIPMENT?
ОтветитьTHE LOCKOUT TAGOUT EQUIPMENT WILL BE PROVIDED? NOTHING ELSE CAN BE USED?
ОтветитьTHE FACILITY MUST HAVE IN WRITING LOCKOUT PROCEDURES AND TRAINING MARKERS?
ОтветитьTAGGING THE MACHINE TELLS OTHERS THE MACHINE IS BEING WORKED ON?
ОтветитьTO KEEP EMPLOYEES FROM REENERGIZING A MACHINE THS,AT IS,BEING REPAIRED IS LOCKOUT?
Ответитьgreat video. so educative
ОтветитьYo
ОтветитьWait what did I just watch
Ответитьdang
Ответитьthanks for the sharing information.
also along the pipe require to release vua drains syatem for any liquid and venting line any pressure inside of facility prior to maintenance and do repaire activity to get safe.
this is very useful
ОтветитьOne addition that should be made is when locking out hydraulic and especially pneumatic machinery. Not only do you have to check to ensure the stored energy is disapated, but it is also good practice to have a plan and procedure to ensure energy is not slowly built back up in the event of a bad valve. One method is to lock it out, disepate the stored energy, waiting a designated period of time, and then recheck to see if energy has leaked into the system. Other methods include gauges that allow visual observation, or installing or cutting in check valves with low pressure settings (ex. 1/10 the required pressure to operate the machinery).
ОтветитьWWC electric leave a comment to represent.
Ответить