The Gisborne to Motu Railway was part of the proposed railway from Gisborne to Auckland. The railway had been proposed since 1876, but it was only local agitation in 1897 that began to get the project moving.
The "first sod" of the railway was turned by Sir Joseph Ward (the Minister of Railways) on 14 February 1900. The railway from Gisborne reached Ormond in 1902, Te Karaka in 1905, Waikohu in 1908, Otoko in 1912 and Matawai in 1913. After the railway line reached Matawai in April 1913, the Public Works Department provided limited train services from May 1913 until 30 October 1914 when the station and completed works were handed over to the Railways Department. The final five mile (8 km) section of the railway from Matawai to Motuhora (renamed Moutohora in 1952) was opened on 26 November 1917. The 49 mile (80 km) line cost 627,000 pounds. Extension of the line to the Bay of Plenty never eventuated.
Source :
https://cknzgp.net/histories/placesRailway.php
Music ; Cinematic Orchestra, To build a Home
Тэги:
#motu #abandoned_tunnel #bridge #shed #hawkes_bay #motuhora #gisborne #puha #otoko #matawai #old_railway #abandoned_railway